Wenzhou Ruirun Machinery Co., Ltd.
+8613566181562
Professional Manufacturing Procedure

Every machine leaving our facility follows a clear, controlled, and traceable process:

Raw Material Inspection (Quality In)

We rigorously inspect critical components before production, ensuring longevity and precision. This includes key parts like stainless steel (for hygiene and durability), servo motors (for speed and accuracy), PLC units (for stable control), cylinders, and specialized moulds.

01

Assembly and Wiring

Expert engineers assemble mechanical components and execute precise electrical wiring, adhering to international safety standards.

02

Professional Programming

Custom programming ensures the machine's efficiency, user-friendliness, and precise control over liquid dosing and folding patterns.

03

Testing and Commissioning

Every machine undergoes extensive dry and wet testing to validate speed, accuracy, and continuous running stability under realistic production loads.

04

Final Inspection Before Delivery

A comprehensive checklist review ensures all mechanical, electrical, safety, and documentation requirements are met prior to shipment.

05

page-1269-952
page-1269-952
page-1280-1707
page-1280-1707
page-1706-1279
page-1706-1279